This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| mailing_list_info [2026-06-23+18:12] – Steve Jones | mailing_list_info [2026-09-23+11:19] (current) – Steve Jones | ||
|---|---|---|---|
| Line 6: | Line 6: | ||
| The next meeting is this Saturday, August 26th, 2023, from 10:30 am. until 12:00 Noon. | The next meeting is this Saturday, August 26th, 2023, from 10:30 am. until 12:00 Noon. | ||
| - | This meeting will be talking about a home fileserver, I started collecting parts a while ago, and now have enough of the parts to show, ask for comments and criticisms, and if anybody has suggestions. I'll be trying a few things with the hardware before putting it to use. | + | This meeting will be talking about a home fileserver, I started collecting parts a while |
| + | ago, and now have enough of the parts to show, ask for comments and criticisms, and if | ||
| + | anybody has suggestions. I'll be trying a few things with the hardware before putting | ||
| + | it to use. | ||
| - | At this point, I'm planning for 40TB of raw storage in a 9 inch cube, but that can change as well. | + | At this point, I'm planning for 40TB of raw storage in a 9 inch cube, but that can |
| + | change as well. | ||
| This meeting is at the Madeira Ridge Branch Library Meeting Room, and Zoom. | This meeting is at the Madeira Ridge Branch Library Meeting Room, and Zoom. | ||
| Line 24: | Line 28: | ||
| Bring a buddy and tell a friend! | Bring a buddy and tell a friend! | ||
| - | If you know someone who might be interested in attending, have them e-mail me, I'll add their address to this list. | + | If you know someone who might be interested in attending, have them e-mail me, I' |
| + | add their address to this list. | ||
| Hope to see you there! | Hope to see you there! | ||
| Line 36: | Line 41: | ||
| The last meeting was this Saturday, August 26th, 2023 | The last meeting was this Saturday, August 26th, 2023 | ||
| - | I got more attendees than I expected, and I guess you're wondering about the hardware I brought, so this e-mail is to go over that list, along with costs; | + | I got more attendees than I expected, and I guess you're wondering about the hardware I |
| + | brought, so this e-mail is to go over that list, along with costs; | ||
| I'll get the video of the meeting up on the clug.org site tonight. | I'll get the video of the meeting up on the clug.org site tonight. | ||
| Line 42: | Line 48: | ||
| Tiny NAS as I'm building it..... | Tiny NAS as I'm building it..... | ||
| If I built this as a 50TB system, the drives would be $949.95 | If I built this as a 50TB system, the drives would be $949.95 | ||
| - | At this point, I only have one drive, every two weeks (Payday), I'll purchase another drive until | + | At this point, I only have one drive, every two weeks (Payday), I'll purchase another |
| - | I have the set. Do NOT purchase all your drives from the same lot, either stagger the purchase, or buy them through multiple channels. I haven' | + | drive until I have the set. Do NOT purchase all your drives from the same lot, either |
| + | stagger the purchase, or buy them through multiple channels. I haven' | ||
| + | the fan listed below, but will. | ||
| I plan on putting 2x 2TB nvme drives in this thing, but I'm still wiggling hardware around. | I plan on putting 2x 2TB nvme drives in this thing, but I'm still wiggling hardware around. | ||
| Line 78: | Line 86: | ||
| | | ||
| </ | </ | ||
| - | |||